Subfloor grinding, self-leveling compound application, and moisture assessment for residential and commercial properties in Metro Vancouver. Precision-flat surfaces that prevent future tile cracking and flooring failure.
Google Rating
Projects Completed
Quote Response
Saved vs Replacement
Floor Leveling Specializations
Subfloor assessment, grinding, and self-leveling compound for uneven floors. Precision flat to within 3mm over 2 metres.
Learn MoreHomes, condos, and townhomes across Metro Vancouver. Subfloor preparation for hardwood, tile, and LVP installation.
Learn MoreRetail, office, and commercial spaces. High-load self-leveling compounds for commercial-grade flooring systems.
Learn MoreUneven subfloors are one of the most common — and most overlooked — causes of flooring failure in Vancouver properties. Tile cracking in kitchens and bathrooms, LVP that clicks and shifts at transitions, hardwood that develops hollow spots — these symptoms are almost always the result of inadequate subfloor preparation rather than defective flooring.
In Vancouver's older housing stock — particularly wood-frame construction from the 1950s through 1980s — subfloor settling, joist movement, and moisture damage create significant unevenness. In newer concrete buildings, form imperfections and slab deflection create similar issues. Both require professional assessment and proper leveling before any floor covering is installed.
We assess subfloor flatness against BC Building Code tolerances, identify moisture issues before they're sealed in, and apply the appropriate self-leveling or grinding solution. The result is a surface that flooring installers and manufacturers require — and that prevents the failures you'd otherwise pay to fix in 3–5 years.
Book Free AssessmentWe level to within 3mm over 2 metres — the tolerance specified by most flooring manufacturers.
We test for moisture before leveling. Sealing a wet slab causes adhesive failure and mould.
Our leveling work meets BC Building Code subfloor flatness requirements.
Self-leveling compound is typically walkable in 4–6 hours. Flooring installation can proceed the next day.
Most flooring manufacturers specify a maximum variation of 3mm over 2 metres (3/16" over 10 feet). Beyond that, you risk tile cracking, floating floor click failures, and hardwood squeaking.
Yes — always. Leveling over a moisture issue seals it in, causing adhesive failure and mould. We test and advise before starting.
Self-leveling compound is typically walkable in 4–6 hours and ready for flooring installation in 24 hours, depending on the product used.
Yes. Self-leveling compound generates minimal dust and low odour. We protect surrounding areas and complete most residential projects in a single day.
Yes. For high spots and ridges in concrete slabs, we grind before applying leveling compound for a fully flat result.
Send us a photo via WhatsApp or fill the form. We assess and price same day — no obligation.